top of page
037_Bas Relief_Mother and boy_AT_6_18_19
041_Bas Relief_overall_AT_6_19_19.jpg
030_Bas Relief_during repatinating_6_14_
IMG_3552.JPG
waxing 2.jpg

The Signing of the Compact (1921) by Cyrus Dallin

Bronze bas-relief at Bas Relief Park, Provincetown, MA

 

Cyrus Dallin’s large cast bronze bas-relief in Provincetown, MA was in poor condition due to decades of exposure to weather and previous attempts at restoration. The bronze required cleaning, removal of calcite drips, repatinating, and a protective coating.

View Other Projects

223.5˚ Arc x 15 by Bernar Venet

2022_ICA_El Anatsui_after install_1_edited.jpg

Area B by El Anatsui

Ellsworth Kelly, cleaning_ed.jpeg

The Courthouse Panels (1998) by Ellsworth Kelly

037_Bas Relief_Mother and boy_AT_6_18_19.jpg

The Signing of the Compact (1921) by Cyrus Dallin

eagle sculpture_after_4.jpg

Boston College Meiji-Era Bronze Eagle

bottom of page